Please click on a school name below to see photos of the Solar Panel project at that school.
°ÄÃÅ¿ª½±Íø installed its first solar system in 2010. °ÄÃÅ¿ª½±Íø currently has solar systems at 37 sites with 13.2 megawatts of generating capacity. °ÄÃÅ¿ª½±ÍøÌýnow has the solar infrastructure capacity to reach Carbon Negative emissions.ÌýAs of June 30, 2023, cumulative energy savings have been estimated at $5.4 million.